What it does
TeraWulf owns, develops and operates digital infrastructure in the United States. It is shifting its focus from bitcoin mining toward hosting high-performance computing (HPC): providing powered, cooled data center space for customers running artificial intelligence, machine learning and cloud applications. Founded in 2021, the company is headquartered in Easton, Maryland. Paul Prager is its chief executive.
The hosting business serves hyperscale and enterprise customers that need substantial computing capacity. TeraWulf controls land or long-term leases, grid interconnection rights, electrical systems and cooling infrastructure, then develops facilities and leases capacity to customers. Customers can install and operate their computing equipment in those facilities. TeraWulf says it does not own the graphics processing units used by its hosting customers.
The company also owns specialized computers that validate transactions on the bitcoin network. Its legacy mining operations use existing infrastructure at its Lake Mariner campus in New York. TeraWulf’s capital allocation and development activity are now focused on HPC data centers rather than new mining investments.
Its development approach uses multiple phases: facilities are built and delivered as customer schedules and power availability permit. The company has operated at Lake Mariner and has expanded its development plans into Kentucky. It also has a ground lease at the Cayuga site in New York, where development depends on permitting and site work.
How it makes money
2025 crypto mining revenue: $151.6 million; third-quarter 2026 total revenue: $76.2 million.
TeraWulf earns bitcoin through its mining operations and has used proceeds from bitcoin sales to fund operations. Mining economics depend on the value of bitcoin, the difficulty of mining it, the computing power deployed across the network and electricity costs. Its specialized mining computers operate at Lake Mariner.
The newer HPC business earns lease revenue from customers that use its data center capacity. Its arrangements typically have base terms ranging from 10 to 25 years, with contractual rent increases and renewal or term-contraction options. Lease revenue includes rent and can also include tenant fit-out work and power costs passed through to customers. Power costs are passed through without markup and included in revenue on a gross basis.
In the third quarter of 2026, HPC lease revenue was $63.0 million and represented approximately 83% of total revenue. It consisted primarily of $46.0 million of rent, $11.3 million of tenant fit-out revenue and 5.4 million of power pass-through revenue. The period reflected 102 critical megawatts operating and generating lease revenue at Lake Mariner.
Contracted capacity is not the same as operating capacity: construction, commissioning and lease commencement determine when the company can collect the full projected lease revenue. TeraWulf expects its revenue mix to shift further toward HPC leasing as contracted facilities are delivered. Its financing sources include cash, bitcoin sale proceeds, equity, debt and project-level financing.
| Product or service | Revenue, FY2025 | Share | Change on the year |
|---|---|---|---|
| Crypto Mining | $151.6 million | 100.0% | 8.83% |
Customers and how it sells
TeraWulf serves hyperscale and enterprise computing customers through long-term data center leases and hosting arrangements. Core42 and Fluidstack are customers at Lake Mariner in Barker, New York. Google provides credit support for Fluidstack’s obligations under certain leases. TeraWulf also has a lease with Anthropic at its Justified campus in Hawesville, Kentucky, with Google credit support associated with project financing.
At Lake Mariner, Core42’s leases cover 60 MW of critical IT load. Fluidstack’s Akela leases cover 378 MW, with facilities developed in phases. TeraWulf reported that CB3 was online and generating revenue under its Fluidstack contract; CB4 and CB5 were scheduled for phased delivery. The company’s HPC customer agreements can include restrictions on serving certain third parties, including customers’ competitors.
TeraWulf’s other development locations include the Cayuga site in Lansing, New York, and Muskie in eastern Kentucky. The Cayuga site has existing interconnection and supporting infrastructure, although its potential capacity depends on permitting and development. It was reported on 23 November 2026 that Muskie had no signed customer when TeraWulf reported third-quarter results.
TeraWulf had developed the Abernathy campus in Texas through a joint venture with Fluidstack. Its third-quarter 2026 results included a gain on the sale of its equity interest in that joint venture.
| Segment | Revenue, FY2025 | Share | Change on the year |
|---|---|---|---|
| Digital Asset Mining Segment | $151.6 million | 100.0% | 8.21% |
Suppliers and costs
Electricity is a major input for both mining and hosting. Lake Mariner draws power from the New York grid, including 90 MW allocated under an agreement with the New York Power Authority. TeraWulf relies on third parties and their infrastructure for power, and access to transmission and interconnection can affect the timing and cost of expansion.
Substantially all of TeraWulf’s bitcoin miners were manufactured by Bitmain. The machines use specialized chips, and power is the most significant direct expense in bitcoin mining. The company also relies on designers, contractors, subcontractors and suppliers to build its data centers.
It was reported on 9 November 2026 that TeraWulf awarded Fluor an engineering, procurement and construction contract for Justified. TeraWulf says the agreement covers three buildings and includes delivery milestones, cost reporting and contractual protections, with guaranteed maximum pricing being established as work progresses.
HPC expenses include power, tenant fit-out, site labor, security and development costs. In 2025, cash used in investing activities was $1,368.9 million, including purchases of plant and equipment and investment in the Abernathy joint venture.
- Revenue$168.5M
- Cost of revenue−$82.7M
- Selling, general and administrative−$147.8M
- Other operating costs−$124.2M
- Operating income−$186.2M
Competitive position
TeraWulf competes for sites with access to substantial power, reliable electricity, capital and customers for HPC and AI infrastructure. Its competitors include data center real estate investment trusts, independent developers, hyperscalers, infrastructure funds and some digital asset miners converting suitable facilities to HPC use. TeraWulf does not name a specific competitor in its description of that market.
The company controls land use, interconnection rights, electrical and cooling systems, and, at some sites, generation. Its team also has experience with power generation, transmission and grid interconnection. Campuses are designed for phased expansion, while certain customer contracts have long terms and credit support. TeraWulf does not currently hold patents and instead relies on trade secrets, trademarks, copyrights and contractual protections.
Our reading: Control of sites and interconnections is a meaningful potential advantage because power access and timely development are central competitive requirements, but expansion remains subject to approvals and construction. [item1] [item1a]
Our reading: Long leases and customer credit support can help finance projects and provide revenue visibility, but their protection depends on the terms and commencement of the leases. [item1] [item1a]
Our reading: In-house power expertise can help with complex projects, although other developers and capital providers also compete for the same sites, electricity and customers. [item1]
Growth opportunities
TeraWulf’s growth plan centers on converting powered sites into leased HPC capacity. The company targets contracting an incremental 250 to 500 megawatts of critical IT capacity annually and believes its existing portfolio can support that target. Actual development depends on customer demand, power availability, grid conditions, financing and delivery schedules.
At Lake Mariner, CB3 was generating revenue in the third quarter of 2026. TeraWulf said CB4 was moving into commercial operation and expected phased CB5 delivery through the end of the first quarter. The company expects Lake Mariner to expand further, subject to the necessary approvals.
At Justified in Kentucky, TeraWulf has an Anthropic lease and Google credit support for project financing. It expects phased ready-for-service deliveries to begin in late 2027 and continue through the second quarter of 2028. The company says it has the equity required under its current plan and expects to fund the remaining capital requirement with project-level debt.
Muskie is another Kentucky development site. TeraWulf says it has a signed electricity service agreement with Kentucky Power for the first 500 megawatts, with delivery starting in 2028; the next 500 megawatts requires new generation. The company is discussing the site with prospective customers. It was reported on 23 November 2026 that an amendment to the Muskie power agreement still required Kentucky Public Service Commission approval.
- $13.4MFY2020
- $15.0MFY2022
- $69.2MFY2023
- $140.1MFY2024
- $168.5MFY2025
Structural risks
- Construction and delivery: Delays, labor or parts shortages, permitting problems and higher costs can postpone lease revenue. Some customers may be able to terminate leases after significant delays, and completion guarantees may be insufficient.
- Power and interconnection: Both businesses need substantial electricity and internet access. Outages, higher power prices, capacity constraints or delays securing transmission and interconnection could disrupt operations or limit expansion.
- Customers and credit support: TeraWulf depends on significant HPC customers. A customer default, insolvency or failure to pay could reduce revenue. Certain backstops take effect only after lease commencement and do not cover every termination event.
- Capital and losses: Data center development is capital-intensive. TeraWulf expects to raise additional capital, which may be unavailable, restrictive or dilutive. It has recorded operating losses and negative operating cash flow; revenue may not exceed operating and capital costs.
- Bitcoin economics: Mining profitability depends on the volatile price of bitcoin, electricity costs and network conditions. Bitcoin rewards are subject to halving, and TeraWulf’s mining machines may not be readily adaptable to other uses.
- Technology and regulation: More efficient AI models could reduce demand for some high-density data center capacity. Changes in power, environmental or digital-asset regulation could also increase costs or restrict operations.
Bottom line
Our reading
TeraWulf is moving from a bitcoin-mining business toward a leased data center infrastructure business; HPC already supplied most revenue in the third quarter of 2026. [item7] [call_prepared] Our reading: Its long leases and power-controlled sites support that transition, but realizing contracted revenue depends on completing facilities, obtaining power and financing, and keeping customers in place. [item1] [item1a] Mining remains exposed to bitcoin prices while the HPC build-out requires substantial capital. [item1a] [item7]