Hut 8 Corp.

HUT Financial Capital Markets

Hut 8 Corp.’s revenue for fiscal 2025 (year ended December 2025) was $235.1 million, up 44.8% from fiscal 2024.

Revenue
−14.9%
EPS
+221.1%
Free cash flow
+173.8%
Total debt
+3,076.5%

Quarter to September 2026, against a year earlier

52.81 6.86 +14.93%
Market cap
$5.7B
P/E
0.0×
Fwd P/E
−11.6×
Dividend yield
—
F-score
n/a
Altman Z
n/a
Beneish M
n/a
Dividend safety
n/a

Hut 8 Corp. (HUT) Business Profile

Updated · Covers results through FY2025 · How this is made

What it does

Hut 8 develops and operates power and digital infrastructure for energy-intensive computing. It secures sites and electricity connections, builds data centers, and operates computing hardware or makes facilities available to customers. Its applications include Bitcoin mining, artificial intelligence (AI), high-performance computing, and cloud and colocation services, in which customers place equipment in a data center.

The business has three connected layers. Power includes land with access to electricity, grid connections and electrical equipment. Digital Infrastructure includes the data centers built around that power. Compute includes businesses that own or operate specialized hardware and sell computing services or earn Bitcoin mining rewards.

Hut 8’s majority-owned American Bitcoin subsidiary mines and accumulates Bitcoin. Hut 8 Canada supplies cloud and data center services to organizations across several industries. Highrise AI offers cloud infrastructure for developers and enterprises training and deploying AI models. Hut 8 is also building data centers for AI customers, including the River Bend campus in Louisiana.

The company was incorporated in Delaware in 2023 and is headquartered in Miami. Asher Genoot is chief executive officer. As of December 31, 2025, Hut 8 had 248 full-time employees in the United States and Canada.

How it makes money

Hut 8 reports Power, Digital Infrastructure, Compute and Other segments. Its Power business develops and manages energy assets that support its data centers. It has also earned money from power generation and managed services, and may use other commercial structures to monetize power assets.

Digital Infrastructure develops and operates facilities for customers’ computing equipment. Hut 8 seeks revenue through hosting, leasing and colocation agreements, including long-term contracts. For Bitcoin mining customers, hosting arrangements can provide fixed fees or a share of profits, often with reimbursement of pass-through costs such as electricity. Revenue from Hut 8’s services to its consolidated American Bitcoin subsidiary is eliminated when the companies’ results are combined.

Compute earns revenue in several ways. American Bitcoin contributes computing power to mining pools and receives Bitcoin mining rewards. Hut 8 Canada uses consumption-based contracts under which customers commit to baseline compute, storage, network or power usage and pay for additional usage. Highrise AI earns contracted infrastructure and service fees. The Other segment currently earns revenue from equipment sales and repairs.

For Q2 2026, revenue was $74.9 million. Compute contributed $72.5 million, while Digital Infrastructure revenue was $1.3 million and Power revenue was $1.2 million. Hut 8 recorded a GAAP net loss of $177.1 million, primarily driven by a $138 million loss in digital assets.

Hut 8 expects its mix to move toward contracted data center cash flows as River Bend and Beacon Point are delivered. Bitcoin holdings are revalued at fair value each reporting period, with changes recognized in net income, so reported earnings can move with the Bitcoin price.

Customers and how it sells

Hut 8 serves organizations needing power, data center capacity and computing services, as well as Bitcoin mining through its own subsidiary. Hut 8 Canada provides cloud and colocation services to customers in industries including technology, financial services, government and media. As of December 31, 2025, it served more than 200 customers through five data centers in Canada.

River Bend is in Louisiana. Fluidstack is expected to be its tenant, while Google is expected to provide a financial backstop covering lease payments and related pass-through obligations for the 15-year base lease term. Hut 8 also identifies Anthropic as the company for which it is building the River Bend campus. American Bitcoin receives managed services and ASIC colocation services from Hut 8, although those intercompany revenues are eliminated in consolidation.

Hut 8’s operating footprint spans the United States and Canada. At December 31, 2025, its managed power assets and data centers included locations in Texas, New York, Alberta, British Columbia and Ontario. Its development projects included sites in Texas and Illinois as well as River Bend. The four Ontario power generation facilities were sold in Q1 2026.

Hut 8 develops customer relationships and projects through partnerships with utilities, power asset owners, infrastructure developers, large power consumers and capital providers.

Suppliers and costs

Electricity is a significant operating cost for Hut 8’s computing businesses. The company uses energy-market analytics and software to guide when equipment runs or reduces consumption. Its costs also include specialized computing hardware, data center equipment, construction materials, labor and site development.

Hut 8 works with outside suppliers and contractors as well as designing infrastructure internally. It partnered with BITMAIN to develop an ASIC miner used in its Vega data center design. It also co-developed an AI data center infrastructure solution with Vertiv for River Bend. Jacobs and Vertiv are partners on River Bend construction; Hut 8 estimated the facility’s cost at $9-$11 million per MW.

The company’s operating costs vary by application. Facilities for high-performance computing require more redundancy and resiliency, while ASIC computing facilities can be built with less redundancy. In Q2 2026, cost of revenue increased by approximately 23% year over year, and gross profit was approximately $48 million. General and administrative expense was $76.1 million; Hut 8 said share-based compensation accounted for approximately $43.6 million of the year-over-year increase.

Hut 8 also uses corporate and project financing. The company raised $7.5 billion of project financing for River Bend and Beacon Point Building 1; the project debt is nonrecourse to the parent.

From revenue to operating income, FY2025
  1. Revenue$235.1M
  2. Cost of revenue−$107.8M
  3. Selling, general and administrative−$122.8M
  4. Other operating costs−$326.5M
  5. Operating income−$322.0M

Competitive position

Hut 8 competes with digital infrastructure developers and large-scale Bitcoin miners for powered land, building materials, data center equipment and skilled labor. It also competes with cloud providers and infrastructure developers for customers and specialized hardware. Its mining pools compete for Bitcoin block rewards. No specific competing companies are named in the available business and risk descriptions.

Hut 8 seeks to distinguish itself by securing power and interconnections before selecting how to commercialize a site. It can initially use ASIC computing to generate revenue from a power asset while retaining the possibility of changing its use. At Vega, the company developed a rack-based design with liquid cooling and retains the flexibility to repurpose the site. At Beacon Point, Hut 8 initially considered Bitcoin mining before contracting the site for AI infrastructure.

Our reading: access to powered sites and the ability to develop them are meaningful competitive assets, but Hut 8 must continue to secure power, equipment and customers in markets where it faces other developers and miners.

Our reading: the option to use sites for different workloads supports the business’s flexibility, although a change of use still depends on site characteristics and customer requirements. The company also uses proprietary software to manage operations and energy consumption.

Growth opportunities

Hut 8 is expanding from Bitcoin-oriented infrastructure into data centers for AI and high-performance computing. It seeks to originate power sites, secure customers, finance construction and operate the resulting facilities under long-term agreements. The company also plans to continue developing its cloud and compute businesses.

River Bend was under construction as of December 31, 2025. Hut 8 targets initial delivery and commissioning in Q2 2027. Its lease calls for a data center with 245 MW of IT capacity, while the project will commercialize 330 MW of utility capacity.

Hut 8 has also contracted two buildings at Beacon Point. The second lease covers 352 megawatts of IT capacity and approximately $9.8 billion of expected base-term contract value. Together with River Bend, Hut 8 says its contracted AI data center capacity is about 949 megawatts, representing roughly $26.6 billion of expected aggregate base-term contract value. Contract value is an expected amount over the lease terms, not current-period revenue.

The company raised approximately $7.5 billion of investment-grade capital for the construction-stage River Bend and Beacon Point Building 1 projects. Hut 8 says these project obligations are nonrecourse to the parent and are designed to be serviced from contracted lease cash flows.

Its development pipeline stood at about 8.7 gigawatts in Q2 2026. The pipeline includes opportunities at different stages, from diligence and exclusivity through development and construction; it is not all contracted capacity.

Revenue by fiscal year
  1. $30.4MFY2020
  2. $138.7MFY2021
  3. $115.9MFY2022
  4. $162.4MFY2024
  5. $235.1MFY2025

Structural risks

  • Construction and delivery: New data centers and expansions can face delays, cost overruns, permitting hurdles, labor shortages and equipment supply problems. Delays can result in customer penalties or affect lease commencement and financing requirements.
  • Bitcoin exposure: Hut 8 holds Bitcoin and earns mining rewards, primarily through American Bitcoin. Bitcoin price changes affect the value of its holdings and net income. Rising network difficulty can reduce mining proceeds and require equipment upgrades.
  • Power availability and prices: Hut 8 needs substantial electrical power. It cannot guarantee that it will obtain additional power on similar terms, or at all, and market prices for power and related services fluctuate.
  • Funding: Infrastructure development requires capital. Hut 8’s ability to meet cash needs depends partly on access to public and private capital markets, operating cash flows and other financing. Project financing proceeds are restricted to specified project purposes.
  • Operational interruptions: Equipment failure, power loss, network downtime, cyber or physical security breaches, severe weather and other disruptions can interrupt facilities and services.
  • Changing regulation: Rules affecting energy-intensive data centers, AI, cybersecurity and digital assets are evolving. New requirements may affect Hut 8’s business model and operations.

Bottom line

Our reading

Our reading: Hut 8 is a power and computing infrastructure business whose present results remain tied to Bitcoin, while its contracted AI projects are intended to add longer-duration data center revenue. (item7, call_prepared)

Our reading: secured project financing and signed leases support that transition, but construction delivery, power access and Bitcoin volatility remain central exposures. (call_prepared, item1a, item7)