What it does
First Solar designs, manufactures and sells solar modules: panels that convert sunlight into electricity. It focuses on supplying large solar power projects rather than selling electricity itself. Its customers include project developers, independent power producers, utilities, businesses and other owners and operators of power systems.
The company is headquartered in Tempe. Mark R. Widmar is its chief executive officer.
First Solar’s modules use a thin layer of cadmium telluride, or CdTe, to absorb sunlight. That is different from the crystalline silicon technology used by its primary competitors. Its products include Series 6 Plus and the larger Series 7 module. The company typically warrants that its modules will produce at least 98% of their labeled power output in the first year, with coverage declining each year over a warranty period of up to 30 years.
First Solar makes its panels through an integrated process in which a sheet of glass moves through semiconductor coating, cell formation, assembly and testing. Its manufacturing footprint includes the United States, India, Malaysia and Vietnam. The company also develops improvements to its technology and operates a recycling program that recovers materials from used modules.
Its business operates as a single segment. Alongside selling modules, it works with customers on delivery schedules, contract terms and product specifications for their solar projects.
How it makes money
First Solar earns sales primarily by manufacturing modules and selling them to third-party customers. It generally prices modules per watt of generating capacity, so the power output of a panel is part of the price calculation. Series 6 Plus and Series 7 are its principal module products; Series 7 has a larger form factor.
Net sales were $5.2 billion in 2025; approximately $1.2 billion in Q3 2026.
Customer contracts can cover deliveries over several years. At the end of 2025, First Solar had contracts for the future sale of 50.1 GW of modules at an aggregate transaction price of $15.0 billion, which it expected to recognize as revenue through 2030 as control of the panels transferred to customers. Some contracts allow price adjustments for technology improvements, freight, commodities, module wattage, domestic content or tariffs. Contract cancellations can reduce the revenue ultimately recognized.
First Solar’s customer engagements have shifted toward contracts for specific projects and delivery schedules, although it remains open to framework agreements with suitable protections. Customers have also deferred some purchases for early-stage projects requiring later deliveries. The company believes this shift can provide more delivery certainty while slowing the pace at which it builds a longer-term backlog.
U.S. manufacturing tax credits also affect profitability and cash flow. First Solar expects to qualify for Section 45X credits on eligible U.S.-made modules sold to third parties, and it has sold credits for cash. The credits are not the same as recurring revenue from operating a solar plant.
Customers and how it sells
First Solar sells to system developers, independent power producers, utilities, commercial and industrial companies, large corporate energy buyers, and other system owners and operators. These customers use its modules in power projects; some corporate buyers participate in the market through long-term electricity purchase arrangements.
The United States is its principal sales market. U.S. revenue was $5.0 billion in FY2025, representing 95.7% of revenue. India contributed $195.6 million, or 3.75%, in FY2025. First Solar also manufactures in Malaysia and Vietnam, in addition to its U.S. and Indian facilities.
Two customers, Silicon Ranch Corporation and NextEra Energy, each accounted for 10% or more of modules business net sales in 2025. The loss of a large customer or a customer’s inability to perform under a contract can reduce sales. First Solar’s contracts may include firm purchase commitments and termination payments, but customers have breached or renegotiated terms in the past.
The company serves projects through direct module supply agreements. It has increasingly discussed project-specific contracts with delivery schedules, while retaining the option of broader framework agreements. First Solar says customers have been concentrating on advancing projects where modules are already secured and deferring procurement for some earlier-stage projects.
| Region | Revenue, FY2025 | Share | Change on the year |
|---|---|---|---|
| United States | $5.0 billion | 95.7% | 27.9% |
| India | $195.6 million | 3.75% | −3.04% |
| All other foreign countries | $22.8 million | 0.44% | −65.1% |
| France | $6.3 million | 0.12% | −81.7% |
Suppliers and costs
First Solar’s production process uses glass, cadmium telluride, other semiconductor materials, adhesives, frames, junction boxes, wiring and packaging components. It qualifies suppliers before using their materials and seeks nearby sources where possible to reduce lead times and costs. Some key materials and components come from a single supplier or a limited number of suppliers, although the company does not name those suppliers here.
Its automated production lines integrate coating, cell formation, assembly and testing. The process does not rely on Chinese crystalline silicon supply chains. First Solar nevertheless sources tellurium globally; China is a major producer, and its export controls can affect tellurium and related products. The company has applied for export licenses where appropriate and is pursuing alternative suppliers.
Manufacturing, materials, logistics, warehousing, duties and tariffs all affect costs. Gross profit as a percentage of sales fell to 40.6% in 2025 from 44.2% in 2024, partly because of a sales mix with more U.S.-produced modules and higher warehousing, tariff and logistics costs. Higher manufacturing credits partly offset those pressures. The company has also reduced international Series 6 production in response to market conditions.
- Revenue$5.2B
- Cost of revenue−$3.1B
- Research and development−$233.4M
- Selling, general and administrative−$203.8M
- Other operating costs−$86.3M
- Operating income$1.6B
Competitive position
First Solar competes for module sales primarily against crystalline silicon manufacturers, most of which it says are linked to China. It does not name individual competing module manufacturers. The principal basis of competition is sales price per watt, although energy yield, reliability, degradation, warranties and payment terms also influence customer decisions.
First Solar says its CdTe technology can produce more energy than crystalline silicon modules with the same nameplate power in some real-world conditions, including hot or humid climates. Its manufacturing process is integrated, and it does not rely on Chinese crystalline silicon supply chains. Its research and development work ranges from laboratory research to product development and manufacturing improvements.
Our reading: The combination of a different semiconductor technology and integrated manufacturing gives First Solar a meaningful source of differentiation, particularly where customers value supply-chain origin and module performance. That advantage is not a guarantee against pricing pressure from crystalline silicon suppliers.
Our reading: U.S. production and sourcing can support its competitive position when customers seek domestic content, but that source of advantage depends in part on policy and eligibility rules that can change. First Solar says some competitors may have access to state support and may be able to sustain very low margins. It also faces potential competition from new entrants and other technologies.
Growth opportunities
First Solar is pursuing demand for utility-scale solar modules in the United States and India. It identifies electricity demand from data centers, industrial activity and other sources as drivers of potential solar development. The company says India has an installed solar generation capacity of approximately 132 GW and cites a government renewable energy capacity target of 500 GW by 2030; those figures are not First Solar sales forecasts.
The company is expanding and adapting its manufacturing capacity. The first phase of its South Carolina Series 6 finishing facility started production in Q3 2026, using partially finished product from Vietnam. First Solar expects the second phase to reach commercial launch in mid-2027, incorporating its CuRe technology.
CuRe is intended to improve module performance by changing elements in the semiconductor structure. First Solar expects its first Series 7 CuRe conversion in India to begin in the first quarter of 2027, ahead of replication across its U.S. Series 7 fleet. Its plans to use Indian front-end output during subsequent U.S. conversions assume a supportive trade environment.
The company is also developing perovskite technology, which it believes could improve module efficiency. Its Ohio pilot line for Series 6-size perovskite modules is targeted for operational readiness in the first half of 2027. Separately, First Solar expects to decide in the first half of 2027 whether its Malaysia facility will operate at full or near-full capacity or shut down production.
- $2.9BFY2021
- $2.6BFY2022
- $3.3BFY2023
- $4.2BFY2024
- $5.2BFY2025
Structural risks
-
Policy and trade: Tax credits, domestic-content rules, tariffs and other policies affect module demand, manufacturing economics and market access. First Solar says uncertainty over foreign-entity guidance and the evolution and enforcement of trade measures has made pricing less clear for customers.
-
Competition and pricing: Global module supply can exceed demand, contributing to lower prices. Some competitors may be able to price near or below manufacturing cost or operate with minimal or negative margins for extended periods.
-
Customers and contracts: Large customers can terminate, breach or renegotiate agreements. Project delays and changing delivery schedules can reduce sales or leave First Solar holding inventory; reselling modules may be constrained by other customers’ project timing and specifications.
-
Materials and operations: Some materials come from limited sources, while tellurium export controls could disrupt supplies. New or modified production lines can also face delays, cost overruns or difficulty achieving expected operating results.
-
Product quality: Manufacturing issues affecting certain Series 7 modules may lead to premature power loss, warranty claims, lower selling prices or inventory charges. Further issues could affect the company’s reputation and financial results.
-
Overseas utilization: First Solar has reduced international Series 6 production amid difficult market conditions. Its Malaysia decision depends on demand, tariffs, trade conditions, unit economics and contract terms.
Bottom line
Our reading
First Solar is a module manufacturer whose business rests on thin-film technology, integrated production and multiyear customer contracts [item1, item7]. Its U.S. manufacturing and supply-chain profile can differentiate it, but the value of those advantages is exposed to changing policy and competition on price [item1, call_prepared]. Converting contracted demand into sales also depends on customer projects, delivery schedules and reliable production [item7, call_prepared].