UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
November 25, 2026
(Date of earliest event reported)
APPLIED DIGITAL CORPORATION
(Exact name of registrant as specified in its charter)
| Nevada | 001-31968 | 95-4863690 |
| (State or other jurisdiction of incorporation) | (Commission File Number) | (IRS Employer Identification No.) |
| 3811 Turtle Creek Boulevard, | Suite 2100, | Dallas, | Texas | 75219 |
| (Address of principal executive offices) | (Zip Code) | |||
214-427-1704
(Registrant’s telephone number, including area code)
N/A
(Former name or former address, if changed since last report)
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General Instruction A.2. below):
o Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
o Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
o Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
o Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
o Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. o
Securities registered pursuant to Section 12(b) of the Act:
| Title of each class | Trading Symbol(s) | Name of each exchange on which registered |
| Common Stock | APLD | Nasdaq Global Select Market |
| Item 7.01. | Regulation FD Disclosure |
On November 25, 2026, the Company posted an updated investor presentation to its website at https://ir.applieddigital.com/news-events/presentations. A copy of the Company’s updated investor presentation is attached as Exhibit 99.1 to this Current Report on Form 8-K and is incorporated into this Item 7.01 by reference.
The information contained in this Item 7.01, including the related information set forth in Exhibit 99.1, is being “furnished” and shall not be deemed “filed” for the purposes of Section 18 of the Securities Exchange Act of 1934, as amended (“Exchange Act”), or otherwise. The information in this Item 7.01 shall not be incorporated by reference into any registration statement or other document pursuant to the Securities Act of 1933, as amended, or into any filing or other document pursuant to the Exchange Act, except as otherwise expressly stated in any such filing.
| Item 9.01. | Financial Statements and Exhibits. |
(d) Exhibits.
| Exhibit No. | Description |
| 99.1 | Investor Presentation |
| 104 | Cover Page Interactive Data File (embedded within the Inline XBRL document). |
SIGNATURE
Pursuant to the requirements of Section 13 or 15 (d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| Dated: November 25, 2026 | By: | /s/ Saidal Mohmand |
| Name: | Saidal Mohmand | |
| Title: | Chief Financial Officer |
Exhibit 99.1

Investor Presentation APPLIED DIGITAL November 2026

2 / 41 Presentation Disclaimers This presentation has been designed to provide general information about Applied Digital Corporation (“Applied Digital” or the “Company”). Any information contained or referenced herein is suitable only as an introduction to the Company. The information contained in this presentation is for informational purposes only. The information contained herein does not constitute or form a part of, and should not be construed as, any offer for sale or subscription of, or any invitation to offer, buy or subscribe for, any securities, nor shall there be any offer, solicitation or sale in any jurisdiction in which such offer, solicitation or sale would be unlawful. This document is not a prospectus. The information contained in this presentation is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. Neither the Company, nor any of its respective affiliates make any representation or warranty, express or implied as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of any of the information or opinions contained in this presentation. This presentation has been prepared without taking into account the investment objectives, financial situation particular needs of any particular person. The trademarks included herein are the property of the owners thereof and are used for reference purposes only. Such use should not be construed as an endorsement of the platform and solutions of Applied Digital. Forward-Looking Statements This presentation contains forward-looking statements that reflect the Company’s current expectations and projections with respect to, among other things, its financial condition, results of operations, plans, objectives, future performance and business. When used in this presentation, the words “could,” “believe,” “anticipate,” “intend,” “estimate,” “expect,” “project” and similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain such identifying words. Forward-looking statements include all statements that are not historical facts. Forward-looking statements are based on information available at the time those statements are made and/or management’s good faith beliefs and assumptions as of that time with respect to future events. Such forward-looking statements are subject to various risks and uncertainties. Accordingly, there are or will be important factors that could cause actual outcomes or results to differ materially from those indicated in these statements. Forward-looking statements may include statements about the Company’s future financial performance, including statements that reflect perspectives and expectations regarding lease agreements and any current or prospective data center campus development; the Company’s expectations regarding net revenue, operating expenses, and its ability to achieve and maintain future profitability; the Company’s business plan and ability to effectively manage growth; anticipated trends, growth rates, and challenges in the Company’s business, particularly in the fields of High-Performance Computing (HPC) and Artificial Intelligence (AI); further development and market acceptance of technologies related to HPC and AI; further development of the Company’s facilities and customer base for related services; beliefs and objectives for future operations; trends in revenue,, cost of revenue, and gross margin; trends in operating expenses, including technology and development expenses, sales and marketing expenses, and general and administrative expenses, and expectations regarding these expenses as a percentage of revenue; and other statements regarding the Company’s future operations, financial condition, and prospects and business strategies. There is no assurance that any forward-looking statements will materialize. You are cautioned not to place undue reliance on forward-looking statements, which reflect expectations only as of this date. Applied Digital does not undertake any obligation to publicly update or review any forward-looking statement, whether as a result of new information, future developments or otherwise. Market and Industry Data This presentation includes information concerning economic conditions, the Company’s industry, the Company’s markets and the Company’s competitive position that is based on a variety of sources, including information from independent industry analysts and publications, as well as Applied Digital’s own estimates and research. Applied Digital’s estimates are derived from publicly available information released by third party sources, as well as data from its internal research, and are based on such data and the Company’s knowledge of its industry, which the Company believes to be reasonable. Any independent industry publications used in this presentation were not prepared on the Company’s behalf. This information involves many assumptions and limitations, and you are cautioned not to give undue weight to these estimates. The Company has not independently verified the accuracy or completeness of the data contained in these industry publications and other publicly available information. Accordingly, we make no representations as to the accuracy or completeness of that data nor do we undertake to update such data after the date of this presentation. An investment in the Company entails a high degree of risk and no assurance can be given that the Company’s objective will be achieved or that investors will receive a return on their investment. Recipients of this presentation should make their own investigations and evaluations of any information referenced herein.

TABLE OF CONTENTS 01 — Company Overview 02 — Market & Structural Advantages 03 — Financial Overview 04 — Macquarie Transaction 05 — Campus Overviews 06 — ChronoScale & Blockchain 07 — Appendix 3 / 41

We build and lease AI data centers Applied Digital develops and owns purpose-built AI data centers and leases them to the world’s largest hyperscalers under long-term contracts for AI training, inference and cloud workloads. AI Factory Platform 4 / 41 Applied Digital 150 MW Standard AI Factory Design Master service and telecom agreements secured with the world's hyperscalers SITE SELECTION Power, land, fiber, community DESIGN Qualified by all major hyperscalers — air- & liquid- cooled with low water usage BUILD Delivering 150 MW in ~14–18 months SCALABLE OPERATION 15–20 standardized roles

Executive Leadership 5 / 41 WC Wes Cummins Chief Executive Officer & Chairman Wes Cummins is the Chief Executive Officer and Chairman of Applied Digital, which he co- founded. He has more than 20 years of experience in technology investing, capital markets, and asset management. Prior to Applied Digital, he held leadership and investment roles at Nokomis Capital and founded 272 Capital LP. He also serves as Chief Executive Officer of 272 Capital and is a member of the board of directors of Sequans Communications. JZ Jason Zhang President & Co-Founder Jason Zhang is the President and Co-Founder of Applied Digital. He is a technology investor and entrepreneur with experience across artificial intelligence, digital infrastructure, and capital markets. Prior to co-founding Applied Digital, he founded Valuefinder and held investment roles at Sequoia Capital and MSD Capital. He holds an A.B. in Economics from Harvard University. SM Saidal Mohmand Chief Financial Officer Saidal Mohmand is the Chief Financial Officer of Applied Digital, where he leads the company’s financial strategy, capital markets activities, and investor relations efforts. Prior to joining Applied Digital, he served as Executive Vice President of Finance and held research roles at 272 Capital and GrizzlyRock Capital. He holds a B.B.A. in Finance and Accountancy from Western Michigan University. LL Laura Laltrello Chief Operating Officer Laura Laltrello is the Chief Operating Officer of Applied Digital and brings nearly 20 years of experience in data center operations and large- scale infrastructure development. Prior to joining Applied Digital, she held senior leadership positions at Honeywell Building Automation and Lenovo Data Center Services. She is recognized for driving operational excellence, scalable growth, and P&L performance. TG Todd Gale Chief Development Officer Todd Gale is the Chief Development Officer of Applied Digital and has more than 45 years of experience developing hyperscale, colocation, and mission-critical data center infrastructure. Prior to joining Applied Digital, he served in senior leadership roles at Flexential and Terremark. He is known for pioneering innovative cooling solutions and leading the development of large-scale data center platforms. EK Erin Kraxberger Chief Marketing Officer Erin Kraxberger is the Chief Marketing Officer of Applied Digital, where she leads corporate marketing, brand strategy, and investor communications. She brings more than 20 years of experience spanning technology, finance, and capital markets. Prior to joining Applied Digital, she served as Chief Operating Officer of 272 Capital and held senior marketing leadership roles at SCW Capital. MC Mark Chavez Chief Compliance Officer & General Counsel Mark Chavez is the Chief Compliance Officer and General Counsel of Applied Digital. He has more than 22 years of experience across the energy, technology, and renewable infrastructure sectors. Prior to joining Applied Digital, he served as in-house counsel overseeing litigation, regulatory matters, M&A transactions, financings, and corporate governance. He leads the company’s legal, compliance, and risk management functions. RT Rich Todaro Corp Development & Investor Relations Rich Todaro is Vice President of Corporate Development and Investor Relations at Applied Digital. He brings nearly 30 years of experience in finance, capital markets, and corporate strategy. Prior to joining Applied Digital, he held leadership positions at WidePoint, Telenav, B. Riley, and Kennedy Capital Management. He is responsible for investor engagement, strategic initiatives, and capital markets communications.

Best-in-Class Team Experience Building World-Class Data Centers Todd Gale Chief Development Officer >45 years of expertise in collaborating with hyperscalers Vice President of Engineering at Flexential, where he led the design and implementation of new data centers and capacity upgrades Steve Lattimer VP of Design & Engineering 35 years as an Electrical professional in design, construction, project management, operations. Formerly at Flexential and Sturgeon Electric. Prime contractor and project lead on multiple data center builds across the country while delivering on time and under budget Brad Barton SVP Construction Procurement Executed over $2.5 billion in mission critical data center projects at DPR Construction. Diverse expertise delivered through multiple hyperscale, wholesale, collocation, and data centers totaling over 500 megawatts for large REITs, social media clients, blockchain, and financial institutions 5 DC Sites Successfully Developed & Deployed by Applied Digital 750 MW+ Previously Constructed Capacity by Applied Digital 150+ Years Cumulative Data Center Experience Among Construction Leadership 2 GW+ Previously Constructed Capacity by Construction Team Investor Presentation 2026 6 / 41 AppliedDigital.com Brings more than 20 years of experience leading hyperscale infrastructure, data center, energy, utility, and mission-critical projects across North America, South America, EMEA, and APAC, most recently with Microsoft. Kwabena Okrah VP of Critical Infrastructure Reliability And Asset Management Brings more than 30 years of construction and infrastructure experience, including 22 years leading complex programs for Fortune 50 companies such as Google and Meta. Shelby Gardner SVP of DC Delivery and Construction

Company timeline at a glance From bitcoin hosting to investment-grade AI infrastructure Investor Presentation 2026 AppliedDigital.com 7 / 41 2021 – 2022 Bitcoin hosting Built 486 MW of bitcoin hosting across three sites IPO and Nasdaq uplisting 2023 – 2024 Cloud and first AI campus Launched cloud business Sold 200 MW of bitcoin hosting Broke ground on first AI campus in Ellendale, ND 2025 First hyperscale leases Signed 400 MW with CoreWeave Signed 200 MW with an investment-grade hyperscaler 2026 Investment-grade scale-up Signed 960 MW of new leases with high investment-grade hyperscalers WHERE THAT LEAVES US Signed leases only ~1,560 MW Contracted IT capacity ~$41B Base-term lease value ~$2.3B Average annual NOI at stabilization, midpoint of margin assumptions ~75% Investment-grade share 15–18 yrs Base lease terms

AppliedDigital.comInvestor Presentation 2026 From Population to Power Hyperscalers Pivot Inland in Search for Power • Traditional Data Centers • Hyperscale Data Centers • Applied Digital Data Centers Legend DF1 PF1 PF2 *Critical Load: Critical IT Load refers to the amount of electrical power dedicated solely to the computing equipment (such as servers, storage, and networking gear) within a data center. It excludes supporting infrastructure like cooling, 8 / 41 DF2 PF3 APPLIED AI FACTORIES Site · Customer Critical IT load under contract* PF1 — Polaris Forge 1 CoreWeave Ellendale, North Dakota 400 MW PF2 — Polaris Forge 2 Investment-grade hyperscaler Harwood, North Dakota 200 MW PF3 — Polaris Forge 3 High investment-grade hyperscaler Center, North Dakota 300 MW DF1 — Delta Forge 1 High investment-grade hyperscaler Louisiana 300 MW DF2 — Delta Forge 2 High investment-grade hyperscaler Alabama 210 MW New — 150 MW lease High investment-grade hyperscaler Location not yet disclosed 150 MW Contracted total 1.56 GW IN NEGOTIATION — NOT YET SIGNED PF2 — Polaris Forge 2 expansion Harwood, North Dakota 100 MW Total with expansion 1.66 GW 5 campuses in 3 states · ND, LA, AL

*Power pipeline includes sites with land under control and/or executed utility agreements for power delivery. This encompasses expansions at existing facilities as well as near-term greenfield/new sites actively progressing through development and permitting processes. Expansions at existing sites may necessitate new generation capacity, transmission lines, transformers, substations, or other infrastructure enhancements. *The described power pipeline, including sites under control/executed agreements and projected expansions/greenfield developments, constitutes forward-looking information; actual outcomes may differ due to risks in permitting, infrastructure needs (e.g., generation, transmission, substations), regulatory approvals, and market conditions. The 3.5–4 GW by 2030 figure is a management goal, not guidance. It assumes ~450–600 MW of new critical IT capacity delivered per year in 2027–30, is not contracted, and there is no assurance it will be achieved. *Contracted capacity is subject to power supply agreement and regulatory approval conditions. Power Pipeline & Our 3.5–4 GW Goal I. TOTAL OF CURRENT SITES (1.66 GW *CRITICAL IT) Operating 275 MW Critical IT online today Under construction 1.285 GW Contracted, delivering through 2028 Contracted 1.56 GW Signed leases, critical IT In negotiation 100 MW Not yet signed 9 / 41 POWER PIPELINE (UTILITY POWER) Active pipeline ~3 GW Near-term greenfield sites and expansions at existing campuses Extended pipeline >5 GW Power and land in early discussion or due diligence OUR GOAL: 3.5–4 GW BY 2030 (CRITICAL IT) +450–600 MW +450–600 MW +450–600 MW +450–600 MW 1.66 GW 2.1–2.3 GW 2.6–2.9 GW 3.0–3.5 GW 3.5–4.0 GW 2026 2027E 2028E 2029E 2030E

Market Structural Advantages Market & Structural Advantages 10 / 41 02

The Best Time in History to Be a Data Center Company Riding the Largest Infrastructure Buildout the World Has Ever Seen 11 / 41

Demand Is Plentiful. Power Is Not. Available power is the constraint on AI data center growth 3× Global demand for data center capacity by 2030(10) >45 GW Projected U.S. data center power shortage by 2030(10) ~50 GW Of the 100 GW of new U.S. grid capacity needed by 2030 will be driven by data centers(11) For scale: 1 GW is roughly the output of one nuclear power plant. ENERGY SOURCE ~BUILD TIME Natural Gas ~2–4 Years Solar + Wind + Batteries (Combo) ~2–4 Years Total Nuclear (Typical) ~10–15 Years Total (10) Boston Consulting Group’s January 2025 report, titled “Breaking Barriers to Data Center Growth” (11) Risk of power outages increase 100x by 2030, warns DOE 12 / 41

STRUCTURAL ADVANTAGE North Dakota is the #3 U.S. oil producer N.D. stands out in red/orange as a top-tier producer, with ~1.19 million bbl/day. The Bakken Shale is one of the largest U.S. shale discoveries. As a result, N.D. is the #3 oil-producing state (behind Texas and New Mexico) (15) Source: Hedgeye - https://x.com/Hedgeye/status/2045205825703018578 13 / 41 DF1 Crude oil reserves in U.S. and Canada

BUILDING ON OUR ADVANTAGES A new pipeline and Base Electron will add power in our region ¹ Contracted capacity is subject to the power supply agreement and to regulatory approval conditions. Base Electron may terminate the PPA if financial close for the facility has not occurred by March 31, 2027. The facility has not yet been built; actual capacity and timing may differ. ² Base Electron is partially owned and managed by certain Applied Digital officers and directors in their individual capacities, along with third parties. Wes Cummins serves as CEO of both companies. Applied's Board approved the PPA on the recommendation of its Base Electron Related Party Transaction Committee. See Applied Digital's Form 10-Q for the quarter ended August 31, 2026. 14 / 41 1 A new gas pipeline is being built across North Dakota ~374 mi Pipeline route ~1 Bcf/d Gas capacity 2029–30 Phased in-service The Bakken East Pipeline (WBI Energy, an MDU Resources subsidiary) will move Bakken gas east to near Fargo to support power generation and industrial demand, including data centers. 2 Applied helped launch Base Electron, an independent power producer (IPP) • Builds and owns its own generation and sells power to the grid and contracted customers • Expected anchor user of the pipeline’s gas, with potential for multiple GW of front-of-the-meter power in our region • October 4, 2026, the Company entered into a Power Purchase Agreement and a related credit support agreement with Base Electron. Applied Digital shareholders own approximately 10% of Base Electron Proposed Bakken East Pipeline route ~374 miles from near Watford City (Bakken) to near Mapleton, just west of Fargo Source: https://www.wbienergy.com/projects/bakken-east-pipeline/

STRUCTURAL ADVANTAGE Our locations face less competition for labor (12) https://cleanview.co/public/data-centers/us Lower labor competition Applied’s locations face fewer competing data center projects for construction and operations talent. Hyperscalers already in the region Our campuses still benefit from the presence of major hyperscalers nearby. MAP KEY Planned data centers Operating data centers 15 / 41

Robust Connectivity Extensive fiber networks pass through our regions Fiber networks are critical for AI Data Centers performance 16 / 41 Rapid fiber network expansion has removed latency as a barrier, enabling high-performance deployments in remote locations.

Supply Chain Applied secured hundreds of MW of supply chain before the market tightened (14) World Wide Technology – AI Day presentation 17 / 41 2 0 1 9 2 0 2 3 2 0 2 5 / 2 6 Generator UPS Switchgear PDU 24-40 WEEKS 40-64 WEEKS 72-96 WEEKS 24-40 WEEKS 64-80 WEEKS 45-50 WEEKS 52-78 WEEKS 32-48 WEEKS 12-20 WEEKS 8-12 WEEKS 4-28 WEEKS 32-40 WEEKS DC EQUIPMENT LEAD TIME

Financial Overview Financial Overview 18 / 41 03

Applied’s contracts and delivery dates All 1,560 MW contracted for delivery by 2028 · $41.13B base-term · $98.36B with renewals Campus Contracted IT Capacity Lease Term Expected Base- Term Lease Value All Renewals Counterparty Credit Rating Delivery Dates Polaris Forge 1 400 MW 15 yrs + 3 × 5-yr $10.71B $27.40B CoreWeave 2H 2025 / 1H 2027 Polaris Forge 2 200 MW 15 yrs + 2 × 5-yr $4.82B $9.18B Investment-Grade 2H 2026 / 1H 2027 Polaris Forge 3 300 MW 15 yrs + 3 × 5-yr $7.50B $18.18B High Investment-Grade 2H 2027 / 2H 2028 Delta Forge 1 300 MW 15 yrs + 3 × 5-yr $7.50B $18.18B High Investment-Grade MID 2027 / 1H 2028 Delta Forge 2 210 MW 15 yrs + 3 × 5-yr $5.20B $12.72B High Investment-Grade 1H 2028 New 150 MW 150 MW 18 yrs + 3 × 5-yr $5.40B $12.70B High Investment-Grade 1H 2028 / 2H 2028 Contracted subtotal 1,560 MW $41.13B $98.36B ~75% Investment-Grade on MW All delivered by 2028 Polaris Forge 2 — expansion 100 MW 2027 Total with expansion 1,660 MW ~76% Investment-Grade on MW All delivered by 2028 Shaded row assumes one additional expansion lease — 100 MW at Polaris Forge 2. Not yet contracted; values are estimates. 1,560 MW Total contracted IT capacity $41B Expected base-term lease value $98B Total value if all renewals exercised ~75% Of MW contacted are with Investment-grade clients “15 yrs + 3 × 5-yr” = 15-year base term plus three five-year extension options. Renewal values assume current contract rates; we expect to renew at higher market rates. Investment-grade share measured by contracted base-term lease revenue. Polaris Forge 1 (CoreWeave, 400 MW) is the non-investment-grade counterparty. *New lease is subject to conditions including power supply agreement approvals *Contracted capacity is subject to power supply agreement and regulatory approval conditions. Investor Presentation 2026 AppliedDigital.com 19 / 41

Applied has secured $41.13 billion in contracted base-term lease value $41.13 billion in total contracted baseline revenue under 15- to 18-year take-or-pay lease agreements. $98.36 billion+ if all renewal options are exercised (up to 33 years). 20 / 41 $10.71 $4.82 $7.50 $7.50 $5.20 $5.40 $41.13 $0 $10 $20 $30 $40 $50 PF1 PF2 PF3 DF1 DF2 New Total Base-Term Contracted Lease Value ($B) $27.40 $9.18 $18.18 $18.18 $12.72 $12.70 $98.36 $0 $20 $40 $60 $80 $100 $120 PF1 PF2 PF3 DF1 DF2 New Total Total Lease Value Including Renewals ($B)

Contracted leases generate ~$2.30 billion in average annual NOI at stabilization ~$2.30 billion in average annual NOI at stabilization, across1,560 MW of signed leases (range $2.22–2.38 billion) - midpoint of margin assumptions across 21 / 41 $0.63 $0.28 $0.42 $0.42 $0.29 $0.26 $2.30 $0.0 $0.5 $1.0 $1.5 $2.0 $2.5 PF1 PF2 PF3 DF1 DF2 New Total Annualized NOI by Site, Midpoint ($B)SITE DETAIL: COUNTERPARTY AND EXPECTED STABILIZED NOI MARGIN Forward-looking; not guidance. NOI shown at the midpoint of each site’s expected stabilized NOI margin (range ± 3 points). Rent equals each lease’s base-term value divided by its term (15 years, or 18 for the new November 2026 lease). Assumes all capacity is online and billing for a full year. NOI and NOI margin are non-GAAP measures; see Appendix. Figures may not sum due to rounding. IG = investment-grade; ~75% of contracted base-term lease revenue is with IG counterparties. Actual results may differ materially. Site Counterparty NOI margin NOI mid. Polaris Forge 1 (400 MW) CoreWeave 88% ± 3% $0.63B Polaris Forge 2 (200 MW) Investment-grade 86% ± 3% $0.28B Polaris Forge 3 (300 MW) High IG 85% ± 3% $0.42B Delta Forge 1 (300 MW) High IG 85% ± 3% $0.42B Delta Forge 2 (210 MW) High IG 85% ± 3% $0.29B New (150 MW) High IG 85% ± 3% $0.26B Total (1,560 MW) ~75% IG ~86% ± 3% $2.30B

MACQUARIE MACQUARIE 22 / 41 04 OVERVIEW

Transaction Overview MACQUARIE ASSET MANAGEMENT (MAM) TRANSACTION FOR INVESTMENT GRADE HYPERSCALERS: APLD Subsidiary: HPC Holdings LLC (“APLDH”) 85% Applied Digital 15% MAM Example 100 MW ➢MAM Preferred Equity investment: $225 mm ➢APLD equity investment: ~$0-$35mm +/- ➢ The remaining amount will be financed (assumes 80% Loan to Cost - LTC) Ownership Structure: MAM will have the right to invest in future hyperscaler projects. At closing, Macquarie will receive a 15% common equity interest in APLD HPC Holdings, a subsidiary of APLD, which will hold the data centers MAM helps finance. Projects financed outside of MAM's investments will be owned and held separately by APLD. Disclosures: **Subject to negotiation of additional definitive documentation . 23 / 41 Macquarie, the #1 infrastructure investment manager, has agreed to partner with Applied Digital, potentially committing up to $5B of capital that could unlock ~$25B for data centers. Up to $5B Macquarie capital commitment ~$25B Data center capacity it could unlock

Transaction Overview EXAMPLE OF THE MACQUARIE TRANSACTION CAPITALIZATION TABLE: Macquarie expects to invest: $2.25 million for every 1 MW - Perpetual Preferred Equity for Ellendale Campus & Future Campuses Applied Digital expects to invest: the remaining equity, $0–$0.35 million per MW - Future Campuses Assumes $/MW range as $11-$13MM **Up to 80% loan-to-cost; ranges show the $11M/MW and $13M/MW cases $MM $/MW % of Cap Economic Interest 100 MW Development Cost $1,100 – $1,300 $11.00 – $13.00 100.0% -- Capitalization Project Debt Financing $875 – $1,040 $8.75 – $10.40 79.5% – 80.0% -- Macquarie Preferred Equity (12.75% PIK Interest) $225 $2.25 20.5% – 17.3% -- APLD Common Equity $0 – $35 $0.00 – $0.35 0.0% – 2.7% 85.0 % MAM Common Equity -- -- -- 15.0 % Total Capitalization of Cost $1,100 – $1,300 $11.00 – $13.00 100.0% 100.0 % Disclosures: **Subject to negotiation of additional definitive documentation ****actual equity splits may slightly differ** . 24 / 41

Transaction Overview SUMMARY OF THE MACQUARIE TRANSACTION CAPITALIZATION TABLE: Issuer ◼ APLD HPC TopCo 2 LLC (“APLDT”) , an indirect wholly-owned subsidiary of Applied Digital Initial Funding / Closing ◼ At least $225 million funded at Closing (availability of up to $2.25 million per 1MW capacity under lease) Facility ◼ Preferred Equity and attached Common Equity (representing 15% of common equity in APLDT) Maturity ◼ Perpetual Dividend ◼ 12.75% payable semi-annually in kind (PIK) or cash during years 0 – 5 ◼ One time increase +0.875% for year 6, payable in PIK or cash ◼ One-time additional increase +0.875% for years 7-10 ◼ Increases +2% per year beginning in year 11, subject to 16.75% cap, payable semi-annually in cash ◼ TemporaryRate step-up upon asset financing for amount above 8.75% Liquidation Preference ◼ For Preferred Equity and attached Common Equity, the greater of (i) Accreted Amounts plus FMV Common Equity and (ii) 1.8x MOIC on Preferred Equity Investment Redemption / Exit Provision ◼ APLDT may redeem all Preferred Equity and attached Common Equity anytime after 30th month for price equal to Liquidation Preference ◼ MAM has right to force redemption in connection with a sale of APLDT or to force a sale of APLDT if Preferred Equity remains outstanding after year 7 Other Terms ◼ MAM has a right to invest up to an $5 billion across Applied Digitial's future HPC data center pipeline ◼ Draw period of 30 months for additional hyperscaler leases executed prior to the 15-month anniversary of Closing ◼ Applied Digital to recover over an estimated $300 million of its equity investment in the Ellendale HPC Campus once RFS date for all Ellendale sites reached ◼ APLDT to be managed by a board of managers controlled by Applied Digital designees, subject to MAM's governance and step-in right Disclosures: **Subject to negotiation of additional definitive documentation . 25 / 41

Campus Overviews Campus Overviews 26 / 41 05

PF1 COREWEAVE RELATED LEASES (18) Presented on a calendar-year basis (19) Contracted revenue figures exclude any amounts attributable to pass-through power (20) See Appendix for management statements on non-GAAP measures 400 MW Contracted Critical IT Load ~15 Year Base Term With Three 5-Year Options ~$11B Contracted Revenue for 400 MW Base Term(19) 88%+/- 3% Expected Site NOI Margins (20) $11M-$13M Anticipated CapEx Per MW PF1 BUILDING 1 - 100 MW ✓ Calendar – 2H 2025 (18) PF1 BUILDING 2 – 150 MW PF1 BUILDING 3 – 150 MW o Calendar – 2H 2026 (18) o Calendar – 1H 2027 (18) 27 / 41 Polaris Forge 1 – 1 100 MW Critical IT Energized Polaris Forge 1 -2 150 MW Critical IT Energized Polaris Forge 1 -3 150 MW Critical IT Under Construction

PF1 BUILDING 1 – 100 MW 28 / 41 Our advantage comes from access to megawatts of affordable energy and a team capable of rapidly building high-quality data centers.

PF1 BUILDING 2 – 150 MW Our advantage comes from access to megawatts of affordable energy and a team capable of rapidly building high-quality data centers. 29 / 41

PF2 INVESTMENT GRADE HYPERSCALER LEASES 200 MW Contracted Critical IT Load ~15 Year Base Term With Two 5-Year Options ~$4.8B Contracted Revenue for 200 MW Base Term(19) 86%+/- 3% Expected Site NOI Margins (20) $11M-$13M Anticipated CapEx Per MW Secured 2 leases for a combined 200 MW at Polaris Forge 2 Unlocking ~$4.8B in anticipated aggregated contract value over a ~15-year horizon 2H26-1H27 Expected Delivery Dates(18) (18) Presented on a calendar-year basis (19) Contracted revenue figures exclude any amounts attributable to pass-through power (20) See Appendix for management statements on non-GAAP measures 30 / 41

300 MW Contracted Critical IT Load ~15 Year Base Term With Three 5-Year Options ~$7.5B Contracted Revenue for 300 MW Base Term(19) 85%+/- 3% Expected Site NOI Margins (20) $11M-$13M Anticipated CapEx Per MW 2H27-2H28 Expected Delivery Dates(18) (18) Presented on a calendar-year basis (19) Contracted revenue figures exclude any amounts attributable to pass-through power (20) See Appendix for management statements on non-GAAP measures 31 / 41 PF3 HIGH INVESTMENT GRADE HYPERSCALER LEASES Secured 2 leases for a combined 300 MW at Polaris Forge 3 Unlocking ~$7.5B in anticipated aggregated contract value over a ~15-year horizon

300 MW Contracted Critical IT Load ~15 Year Base Term With Three 5-Year Options ~$7.5B Contracted Revenue for 300 MW Base Term(19) 85%+/- 3% Expected Site NOI Margins (20) $11M-$13M Anticipated CapEx Per MW MID27-1H28 Expected Delivery Dates(18) (18) Presented on a calendar-year basis (19) Contracted revenue figures exclude any amounts attributable to pass-through power (20) See Appendix for management statements on non-GAAP measures 32 / 41 DF1 HIGH INVESTMENT GRADE HYPERSCALER LEASES Secured 2 leases for a combined 300 MW at Delta Forge 1 Unlocking ~$7.5B in anticipated aggregated contract value over a ~15-year horizon

210 MW Contracted Critical IT Load ~15 Year Base Term With Three 5-Year Options ~$5.2B Contracted Revenue for 210 MW Base Term(19) 85%+/- 3% Expected Site NOI Margins (20) $11M-$13M Anticipated CapEx Per MW 1H28 Expected Delivery Dates(18) (18) Presented on a calendar-year basis (19) Contracted revenue figures exclude any amounts attributable to pass-through power (20) See Appendix for management statements on non-GAAP measures 33 / 41 DF2 HIGH INVESTMENT GRADE HYPERSCALER LEASES Secured 1 lease for 210 MW at Delta Forge 2 Unlocking ~$5.2B in anticipated aggregated contract value over a ~15-year horizon

150 MW Contracted Critical IT Load 18 Year Base Term With Three 5-Year Options ~$5.4B Contracted Revenue for 150 MW Base Term(19) 85%+/- 3% Expected Site NOI Margins (20) $11M-$13M Anticipated CapEx Per MW Applied Digital 150 MW standard AI factory design Illustrative rendering; site location not yet disclosed 1H28-2H28 Expected Delivery Dates(18) (18) Presented on a calendar-year basis (19) Contracted revenue figures exclude any amounts attributable to pass-through power (20) See Appendix for management statements on non-GAAP measures *contracted capacity is subject to power supply agreement and regulatory approval conditions. 34 / 41 NEW 150 MW HYPERSCALER LEASE Secured 1 lease for 150 MW (signed November 2026) unlocking ~$5.4B in anticipated aggregated contract value over an 18-year base term

ChronoScale Corp ChronoScale Corp 35 / 41 06 OVERVIEW – Symbol CHRN

ChronoScale ownership Applied Digital currently owns the significant majority of ChronoScale Corp – Symbol CHRN. ChronoScale is a compute platform purpose-built to support demanding artificial intelligence workloads. Focused on large-scale deployments, the platform is designed to deliver dedicated compute environments optimized for performance, consistency, and long-term operational execution. Built on a foundation of experienced operators, engineers, and infrastructure leaders, ChronoScale combines scalable architecture with operational discipline to support high-performance deployments at scale For more information contact – Gateway Group, Inc. Matt Glover and Ralf Esper T: 949-574-3860 [email protected] 36 / 41

ChronoScale Holdings Corporation A newly independent, Nasdaq-listed neocloud built for large-scale AI compute — comprised of Applied Digital’s former cloud business CHRN Nasdaq-listed May 5, 2026 Majority owned by Applied Digital RECENT CUSTOMER WINS Microsoft ~50 MW • Three-year GPU services partnership (Aug 2026) • NVIDIA GB300 NVL72 with liquid cooling; deployments expected in 2027 Leading frontier AI lab Up to $7.5B TCV • Six-year development partnership; initial deployment • First phase largely backstopped by an investment-grade tech company; $750M financing raised Why it was separated: splits long-duration data center hosting (Applied Digital) from shorter-cycle GPU cloud compute (ChronoScale), so each can raise capital and scale to its own risk/return profile. ChronoScale (Nasdaq: CHRN) was formed from Applied Digital’s cloud business on May 5, 2026; the legacy Ekso business was sold Sept 30, 2026. Deployments are subject to financing, delivery and acceptance milestones. Sources: ChronoScale Form 8-Ks (Aug 27, Oct 1 and Oct 15, 2026), Form 10-Q for the quarter ended Aug 31, 2026, and ChronoScale development partnership announcement. *subject to HSR clearance Investor Presentation 2026 AppliedDigital.com 37 / 41

BLOCKCHAIN BLOCKCHAIN 38 / 41 06 OPERATIONS OVERVIEW

Blockchain operations Applied Digital’s current focus remains to prioritize the build-out of AI Factories to support demand Jamestown Ellendale N O RT H DA KOTA E L N 0 1 ~ 1 0 6 M W ~ 1 8 0 M W Applied Digital currently operates two data centers with ~286 MW of capacity, providing energized infrastructure for blockchain mining customers. Our key customer is Marathon Digital (MARA). We focus exclusively on infrastructure and supporting services and do not own any mining equipment 39 / 41

Find out more about us at www.applieddigital.com For inquiries, contact [email protected] Corporate HQ Applied Digital Corporation 3811 Turtle Creek Blvd. Suite 2100 Dallas, TX 75219 Investor Relations Contacts Matt Glover and Ralf Esper Gateway Group, Inc. (949) 574-3860 [email protected] 40 / 41

Non-GAAP Financial Measures This Investor Presentation contains the following financial measures: Net Operating Income (NOI) and NOI Margin (as defined below), each of which is not calculated in accordance with U.S. Generally Accepted Accounting Principles (“GAAP”). Presentations of these non-GAAP financial measures are intended to aid investors in better understanding the factors and trends affecting the Company’s performance and liquidity. However, investors should not consider these non- GAAP financial measures as a substitute for financial measures determined in accordance with GAAP, including net income (loss), income (loss) from operations, net cash provided by (used in) operating activities, or revenue. The Company cannot reconcile its expected site NOI and NOI Margin without unreasonable effort because certain items that impact net operating income and other reconciling metrics are out of the Company’s control and/or cannot be reasonably predicted at this time. Net Operating Income (NOI) and NOI Margin are non-GAAP financial measures that the Company defines as follows: NOI represents rental revenue less rental property operating expenses, property taxes and insurance expenses (as reflected in the statement of operations). NOI Margin is a ratio calculated by dividing NOI by aggregate rental revenue and is expressed as a percentage (“NOI margin”). NOI is commonly used by stockholders, a company’s management and industry analysts as a measurement of operating per formance of the company’s rental portfolio. However, because NOI excludes depreciation and amortization and captures neither the changes in the value of the Company’s data centers that result from use or market conditions, nor the level of capital expenditures and capitalized leasing commissions necessary to maintain the operating performance of the Company’s data centers, all of which have real economic effect and could materially impact the Company’s results of operations, the utility of NOI and NOI Margin as measures of the Company’s performance is limited. Other companies, including REITs, may calculate NOI and NOI Margin differently than we do and, accordingly, our NOI and NOI Margin may not be comparable to these companies’ NOI and NOI Margin. These non- GAAP financial measures should be considered only as supplemental to financial measures such as net income, computed in accordance with GAAP, as measures of Company’s performance. NOI reflects expected stabilized net operating income and is a non- GAAP financial measure. Actual results may differ materially due to lease-up timing, operating costs, and other factors. Appendix Management Statements on Non-GAAP Measures 41 / 41