Ormat Technologies, Inc.’s revenue for fiscal 2025 (year ended December 2025) was $989.5 million, up 12.5% from fiscal 2024.

Revenue
+10.2%
EPS
+30.8%
Free cash flow
n/m
Total debt
+23.2%

Quarter to September 2026, against a year earlier

84.56 0.56 +0.67% Wed 4:00pm ET

After hours trading: 84.60, up 0.05%, last trade Wed 4:01pm Eastern.

Market cap
$5.2B
P/E
38.4×
Fwd P/E FY26e
38.2×
Dividend yield
0.57%
F-score
4/9
ROIC
2.37%
Net debt / EBITDA
4.9×
Payout ratio
0.2×

Ormat Technologies, Inc. (ORA) Business Profile

Updated · Covers results through FY2025 · How this is made

What it does

Ormat Technologies develops, builds, owns and operates renewable power plants, primarily geothermal facilities that use heat from beneath the earth to generate electricity. It sells that electricity mainly to utilities under long-term agreements. Its portfolio also includes solar power and facilities that turn residual industrial heat into electricity without burning additional fuel.

The company has a second business that designs and manufactures equipment for geothermal and recovered-heat power plants. It sells power units and pumps to plant developers and operators and can also engineer, procure and construct a complete plant for a customer. The same manufacturing capabilities support projects that Ormat owns itself.

A third business owns and operates battery storage facilities connected to electricity grids. These facilities provide energy, capacity and grid-support services. Their customers can pay under longer-term contracts, while some services are sold into merchant markets, where revenue depends on market conditions.

Ormat is also working on enhanced geothermal systems, or EGS, which aim to produce geothermal power in places without sufficient naturally occurring underground reservoirs. It is advancing pilots with SLB and Sage Geosystems.

Doron Blachar is chief executive officer. Ormat had 1,648 employees in FY2025.

How it makes money

Ormat earns revenue through three segments: Electricity, Product and Energy Storage. In Electricity, it sells power generated by plants it owns or controls. Substantially all output from its geothermal plants is sold under long-term power purchase agreements, most with fixed prices denominated in or linked to the U.S. dollar or Euro. As of December 31, 2025, those contracts had a weighted average remaining term of approximately 14 years, based on their contributions to segment revenue. Its standalone solar plants also sell output under long-term agreements.

The Product segment manufactures geothermal and recovered-energy power units and production pumps, and provides engineering, procurement and construction services. Equipment and construction customers usually pay in installments tied to contractual milestones. Ormat also supplies spare parts and gives product warranties and performance guarantees. Revenue therefore depends on orders and the progress of manufacturing and construction, rather than solely on a recurring electricity bill.

Energy Storage sells energy, capacity and ancillary services that help support the grid. Some facilities operate under tolling or capacity agreements; others earn revenue in merchant markets. Long-term tolling agreements can secure fixed revenues, while merchant revenue varies with market prices. Ormat expects future U.S. storage projects to come online under full tolling agreements.

In the third quarter of 2026, total revenue was $275 million. Electricity revenue was $163.7 million, Product revenue was $61.5 million and Energy Storage revenue was $49.9 million. Storage revenue increased as new capacity contributed and existing assets captured merchant pricing in PJM.

Customers and how it sells

Electricity customers include governmental, public and private utilities. In the year ended December 31, 2025, SCPPA accounted for 17.8% of total revenues, NV Energy for 13.8%, and KPLC in Kenya for 11.9%. Purchasers from Ormat’s foreign power plants are primarily state-owned entities in countries with below-investment-grade ratings.

Ormat operates geothermal plants in the United States and internationally, including in Guatemala, Kenya, Guadeloupe and Honduras. It also holds minority interests in geothermal projects in Indonesia. Its Product customers include plant contractors, developers and operators, pipeline companies and other industrial businesses with usable waste heat. Equipment is sold under supply agreements, while complete plants can be delivered through construction contracts.

Storage facilities serve utilities and electricity markets. Ormat operates in California, Texas and the East Coast, mainly in the PJM market. Its Energy Storage revenue was 100% generated in the United States in the year ended December 31, 2025.

Ormat has also contracted for data-center-related demand. Its geothermal portfolio agreement to supply Google through NV Energy is subject to Nevada regulatory approval. The company has a separate geothermal agreement with Switch, Inc.

Suppliers and costs

Ormat manufactures power-generation equipment for its own projects and third-party customers, primarily to fulfill orders. Its equipment designs include turbines, pumps and heat exchangers. The company also buys equipment and services from others: it buys batteries from Tesla and other suppliers, and its U.S. storage growth relies on imported batteries from China.

Developing a geothermal project involves land rights, exploration, drilling, plant construction and connection to the grid. Ormat says confirmation of a commercially viable resource through drilling and testing generally takes two to five years from the start of active exploration. Operating facilities require maintenance, equipment replacement and resource management. Product contracts also involve manufacturing and construction costs, warranties and performance guarantees.

Ormat uses operating cash flow, borrowing, project financing, tax monetization and sales of project interests among its funding sources. It estimated approximately $675.0 million of capital expenditures for 2026, including new projects, exploration, an EGS pilot and maintenance. It expected $303.7 million in long-term debt repayments that year. The company says higher tariffs on imported batteries, raw materials and equipment could increase project costs or slow storage growth if it cannot pass increases to customers.

From revenue to operating income, FY2025
  1. Revenue$989.5M
  2. Cost of revenue−$716.9M
  3. Research and development−$6.3M
  4. Selling, general and administrative−$98.5M
  5. Other operating costs−−$1.3M
  6. Operating income$169.2M

Competitive position

Ormat competes for geothermal resource rights and project sites with smaller developers and newer entrants using advanced subsurface technologies. In Indonesia, it faces Kaishan, PT Pertamina Geothermal Energy, PT Star Energy and Chevron, which partnered with Pertamina in a tender. Companies pursuing next-generation geothermal also compete for leases, talent and funding.

In equipment, competitors differ by technology. Mitsubishi Heavy Industries, Fuji Electric and Toshiba supply steam turbines; Mitsubishi, through Turboden, and Baker Hughes also compete in binary technology. Ormat competes with engineering and construction contractors for complete plant projects, and with developers, power producers and equipment providers in energy storage.

Ormat says increased Product competition has affected its ability to secure orders and reduced operating margins. Its technology includes proprietary designs for equipment that converts heat into power, and its issued patents have varying remaining terms. The company says no single patent loss would materially affect its business.

Our reading: Ormat’s integration of development, manufacturing and plant operation provides a meaningful competitive advantage because it can use its equipment and operating experience across projects. Our reading: Its technology and patents provide some protection, but competing equipment suppliers and pressure on Product margins limit that protection. Our reading: Land rights and long-term contracts support its existing projects, although they do not remove competition for future sites and customers.

Competitor Where they compete Threat (our reading)
Kaishan Geothermal development in Indonesia and binary power equipment High
PT Pertamina Geothermal Energy Geothermal project development in Indonesia Medium
PT Star Energy Geothermal project development in Indonesia Medium
Chevron Geothermal tender in Indonesia with Pertamina Medium
Mitsubishi Heavy Industries Steam turbines and binary power equipment through Turboden High
Fuji Electric Co., Ltd. Steam turbines and international power equipment High
Toshiba Corporation Steam turbines for power plants Medium
Baker Hughes Binary power technology and subsurface-to-surface solutions Medium

Growth opportunities

Ormat plans to expand by building geothermal and solar plants, adding battery storage, acquiring assets and increasing output at existing facilities. It also seeks to extend electricity contracts and negotiate new terms as older agreements approach expiration. In February 2026, it entered a geothermal portfolio agreement intended to support Google’s data-center energy needs; the arrangement requires Nevada regulatory approval.

The company reported an electricity portfolio of approximately 1,358 MW globally in the third quarter of 2026. It had 204 MW of electricity projects under construction and development through the end of 2028, all supported by long-term power purchase agreements. Its operating storage portfolio stood at 495 MW or 1,358 MWh, with seven storage projects under construction and development.

Ormat targets an electricity portfolio of 2-2.1 GW and storage of 1.5-1.6 GW by year-end 2030. Those targets exclude EGS. Its EGS pilots with SLB and Sage Geosystems are intended to test subsurface performance, with drilling planned for late 2026 to early 2027. Ormat estimates its EGS land position could support 5 to 6 GW of future development; that estimate is based on geological analysis and models and requires drilling for confirmation.

The company is also negotiating a power purchase agreement for Dixie Valley, its first planned commercial EGS project. Ormat says its longer-term target of 1 GW of operating EGS projects between 2033 and 2035 is subject to pilot results, project economics and final investment decisions.

Revenue by fiscal year
  1. $663.1MFY2021
  2. $734.2MFY2022
  3. $829.4MFY2023
  4. $879.7MFY2024
  5. $989.5MFY2025
  6. $1.2BFY2026 guidance

Structural risks

  • Plant and resource performance: Equipment failures, maintenance, natural disasters and changes in geothermal resources can interrupt generation. A hurricane-related outage at Puna reduced third-quarter 2026 revenue by $5.1 million; Ormat planned well cleanouts that would temporarily reduce revenue further.
  • Project development and financing: New projects can face difficulty securing permits, land, transmission access, power contracts or financing. Equipment, material and labor shortages can increase costs or delay completion. Ormat also says project financing could become more expensive or difficult to obtain.
  • Storage market exposure: Facilities without long-term sales agreements face variable revenues and profitability. Ormat says new storage tolling prices in Texas have declined and some previously executed agreements were cancelled.
  • Competition and supply costs: More competition has affected Product orders and margins. Higher tariffs on imported batteries and other equipment could raise capital costs or slow U.S. storage growth if Ormat cannot pass costs through.
  • International operations: Foreign projects face risks including currency-transfer restrictions, changes in government policy, political instability and attempts by state customers to renegotiate power prices.
  • EGS execution: Ormat says EGS must demonstrate sustained temperature, flow, water balance and well integrity, with seismicity managed at a cost supported by the power contract. Commercial viability and timing remain uncertain.

Bottom line

Our reading

Ormat combines long-term contracted power generation with equipment sales and battery storage, giving it several ways to participate in renewable power development. Our reading: Its existing contracts and integrated capabilities support the business, but equipment orders, merchant storage prices and the performance of geothermal resources can vary. Expansion also requires capital and successful project execution, while EGS remains a development opportunity whose economics and operating performance still need to be demonstrated.